Playwell Pools Inc.

Pool Deck Construction | Orange County

Pool Deck Construction in Orlando, FL

Pool deck construction is the surface around the pool: the base, drainage slope, coping edge and the finish you walk on, built to shed water away from the pool and the house.

Playwell Pools serves Orlando, FL. Orlando is the county seat of Orange County and the center of the Central Florida metro area.

Swimming pool

Family-owned

40+ years

Building pools since 1985

Certified Pool/Spa Contractor

CPC1457140

Active Verify on DBPR

Certified General Contractor

CGC1511541

Active Verify on DBPR

Counties served

Orange, Seminole, Osceola, Lake, Volusia

Central Florida, from Orlando

How it works

Pool Deck Construction, step by step

The order of work for pool deck construction in Orlando, where the permit and its inspections run through the City of Orlando Permitting Services Division. Playwell gives a project-specific schedule after the site review.

  1. Layout and drainage plan
  2. Base preparation
  3. Plumbing and electrical check
  4. Coping and edge
  5. Surface
  6. Joints and sealing

Each step explained: pool deck construction overview

Permits in Orlando

Who reviews and inspects the work

City of Orlando Permitting Services Division

The city's residential pool checklist lists building, electrical and engineering permits for a typical pool, plus a plumbing or gas permit when the pool has a gas heater or an automatic fill line. It also asks for a site plan that meets city standards, your zoning district and, if applicable, your HOA.

Checked on the official site on 2026-10-21. Requirements change; the building department's current checklist governs.

Every new residential pool in Florida needs one of five safety features before it can pass final inspection (s. 515.27, F.S.). Many HOAs also require architectural approval before work starts.

Pool permits and HOA approval Florida pool safety law

Pool Deck Construction in Orlando: common questions

Who issues pool permits in Orlando, FL?

The City of Orlando Permitting Services Division. The city's residential pool checklist lists building, electrical and engineering permits for a typical pool, plus a plumbing or gas permit when the pool has a gas heater or an automatic fill line. It also asks for a site plan that meets city standards, your zoning district and, if applicable, your HOA.

Does every Orlando mailing address permit with the city?

Only addresses inside Orlando city limits. Unincorporated areas nearby permit through the Orange County Division of Building Safety. Confirm which office covers your address before applying.

What deck surfaces are common in Central Florida?

Concrete pavers, travertine pavers, and poured concrete with a broom, textured or spray finish are all common. Lighter, textured surfaces stay cooler and less slippery underfoot.

Does a pool deck need a permit?

Usually it is part of the pool permit, and the deck and piping are inspected before they are covered. A raised wood deck or platform is different: Orange County, for example, requires a separate permit with sealed plans.

Planning a pool in Orlando?

Send a short project brief. Playwell reviews it, reaches out by your preferred method, and schedules a site review before any quote.