A concrete pool is built in place: the hole is dug to the design, reinforced with steel, plumbed, and shot with concrete (gunite or shotcrete), then finished with plaster, aggregate or tile, so shape, size and depth are not limited by a factory mold.

Playwell Pools serves Kissimmee, FL. Kissimmee is the county seat of Osceola County, south of Orlando.

Swimming pool

Family-owned

40+ years

Building pools since 1985

Certified Pool/Spa Contractor

CPC1457140

Active Verify on DBPR

Certified General Contractor

CGC1511541

Active Verify on DBPR

Counties served

Orange, Seminole, Osceola, Lake, Volusia

Central Florida, from Orlando

How it works

Concrete Pool Construction, step by step

The order of work for concrete pool construction in Kissimmee, where the permit and its inspections run through the City of Kissimmee Building Division. Playwell gives a project-specific schedule after the site review.

  1. Layout and excavation
  2. Steel and plumbing
  3. Bonding and electrical rough-in
  4. Shell
  5. Tile, coping and deck
  6. Interior finish and start-up

Each step explained: concrete pool construction overview

Permits in Kissimmee

Who reviews and inspects the work

City of Kissimmee Building Division

The Building Division permits work inside Kissimmee city limits under the current Florida Building Code. Homes in unincorporated Osceola County go to the Osceola County Building Office (osceola.org) instead.

Checked on the official site on 2026-10-21. Requirements change; the building department's current checklist governs.

Every new residential pool in Florida needs one of five safety features before it can pass final inspection (s. 515.27, F.S.). Many HOAs also require architectural approval before work starts.

Pool permits and HOA approval Florida pool safety law

Concrete Pool Construction in Kissimmee: common questions

Who issues pool permits in Kissimmee, FL?

The City of Kissimmee Building Division. The Building Division permits work inside Kissimmee city limits under the current Florida Building Code. Homes in unincorporated Osceola County go to the Osceola County Building Office (osceola.org) instead.

Does every Kissimmee mailing address permit with the city?

Only addresses inside Kissimmee city limits. Unincorporated areas nearby permit through the Osceola County Building Office. Confirm which office covers your address before applying.

Which inspections does a concrete pool go through?

It depends on the jurisdiction. The City of Orlando's residential pool checklist, for example, lists electrical pool steel grounding, building pool steel, electrical underground and pool deck and piping pressure inspections in its recommended sequence, before the final.

How long does a concrete pool take to build?

Playwell gives a project-specific schedule after the site review. Permit review time, weather, inspections and the finish you choose all affect it.