Concrete Pool Construction | Orange County
Concrete Pool Construction in Apopka, FL
A concrete pool is built in place: the hole is dug to the design, reinforced with steel, plumbed, and shot with concrete (gunite or shotcrete), then finished with plaster, aggregate or tile, so shape, size and depth are not limited by a factory mold.
Playwell Pools serves Apopka, FL. Apopka is a city in northwest Orange County, northwest of Orlando.
Family-owned
40+ years
Building pools since 1985
Counties served
Orange, Seminole, Osceola, Lake, Volusia
Central Florida, from Orlando
How it works
Concrete Pool Construction, step by step
The order of work for concrete pool construction in Apopka, where the permit and its inspections run through the City of Apopka Building Safety Division. Playwell gives a project-specific schedule after the site review.
- Layout and excavation
- Steel and plumbing
- Bonding and electrical rough-in
- Shell
- Tile, coping and deck
- Interior finish and start-up
Permits in Apopka
Who reviews and inspects the work
City of Apopka Building Safety Division
Building Safety, part of the city's Community Development Services, handles permits inside Apopka city limits. Homes in unincorporated Orange County near Apopka permit through Orange County instead.
Checked on the official site on 2026-10-21. Requirements change; the building department's current checklist governs.
Every new residential pool in Florida needs one of five safety features before it can pass final inspection (s. 515.27, F.S.). Many HOAs also require architectural approval before work starts.
Concrete Pool Construction in Apopka: common questions
Who issues pool permits in Apopka, FL?
The City of Apopka Building Safety Division. Building Safety, part of the city's Community Development Services, handles permits inside Apopka city limits. Homes in unincorporated Orange County near Apopka permit through Orange County instead.
Does every Apopka mailing address permit with the city?
Only addresses inside Apopka city limits. Unincorporated areas nearby permit through the Orange County Division of Building Safety. Confirm which office covers your address before applying.
How long does a concrete pool take to build?
Playwell gives a project-specific schedule after the site review. Permit review time, weather, inspections and the finish you choose all affect it.
What is the difference between gunite and shotcrete?
Both are concrete sprayed through a hose. Gunite is a dry mix with water added at the nozzle; shotcrete arrives wet from a mixer. Both produce a structural pool shell when applied correctly.
Planning a pool in Apopka?
Send a short project brief. Playwell reviews it, reaches out by your preferred method, and schedules a site review before any quote.